Propsearch guide to Dubai real estate: Developments
Westar Corona
Townhouse row, JVC District 12, Jumeirah Village Circle, Dubai
Updated 7th Jan 2021
Westar Corona Key Information
Location type
Townhouse row
Area
Phase
Complete
Floors
3
Floors below ground
1
Building type
Low-rise building
If you would like to use any of our images please read about our free Propsearch Media Library.
Companies Associated with Westar Corona
Developer
Architectural Consultant
Contractor
Piling Contractor
- Westar Corona is a townhouse row in JVC District 12, Jumeirah Village Circle, Dubai.
- The project was launched in 2018.
- Construction began in 2018 and was completed by Q4 2020.
- The project was developed by Westar Properties.
- The project was designed by Arec Engineering Consult.
- The main building work was done by Infinity Noble Constructions LLC and the piling work was carried out by Anmol Piling.
- The substructure contains one basement level which is dedicated to parking.
- The project is located on plot JVC12FFRP004.
- From Westar Corona it takes roughly 23 minutes to drive to Dubai Mall, 18 minutes to Palm Jumeirah, 20 minutes to Burj Al Arab and 23 minutes to The Walk JBR.
- Dubai International Airport (DXB) is roughly 29 minutes' drive and the new Al Maktoum International Airport is roughly 35 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
Properties
One-click links to properties currently on the market in Westar Corona.
Properties for sale in Westar Corona
Westar Corona Milestones
Date Launched
2018
Construction Started
2018
Date Completed
Q4 2020
Proximity to landmarks
Palm Jumeirah
18 mins drive
Al Maktoum International Airport
35 mins drive
La Mer
30 mins drive
Mall of the Emirates
19 mins drive
Dubai Mall
23 mins drive
Burj Al Arab
20 mins drive
Ibn Battuta Mall
22 mins drive
The Walk JBR
23 mins drive
Dubai International Airport
29 mins drive
Construction History
If you would like to use any of our images please read about our free Propsearch Media Library.
Westar Corona Construction Progress
Main structure
2020
Jul
Topped out
Facade
2020
Jul
In early stages
The dates above refer to when we monitored the site and not the exact date that construction reached a particular stage.
Please note that our progress updates are visual estimations only and should not be confused with official progress reports issued by the government regulator.
Nearby Attractions
GGICO JVC Tower
Residential building,
0.2km
The Els Golf Club
Golf club,
1.7km
Dubai Miracle Garden
Leisure destination,
2.9km
Jumeirah Golf Estates Golf Course
Golf club,
3.9km
Dubai Polo & Equestrian Club
Mixed-use building,
4.0km
Montgomerie Golf Course
Golf club,
4.5km
Trump International Golf Course
Golf club,
4.9km
We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here: