Propsearch guide to Dubai real estate: Developments
Untitled Plot JVC11YMRA007
Residential building, JVC District 11, Jumeirah Village Circle, Dubai
Updated 6th Mar 2021
Untitled Plot JVC11YMRA007 Key Information
Location type
Residential building
Area
Phase
Under development
Floors
5
Floors below ground
2
Building type
Mid-rise building
Companies Associated with Untitled Plot JVC11YMRA007
Developer
Architectural Consultant
Contractor
Piling Contractor
- Untitled Plot JVC11YMRA007 is a five-storey residential building under development in JVC District 11, Jumeirah Village Circle, Dubai.
- The project was launched in 2016.
- Construction began in 2016.
- The project is being developed by Tiger Properties.
- The design contract was awarded to Design Center.
- Tiger International General Contracting has been appointed as the main contractor and the piling work is being carried out by Rabat Foundation.
- The substructure contains two basement levels which are dedicated to parking.
- The project is located on plot JVC11YMRA007.
- From Untitled Plot JVC11YMRA007 it takes roughly 20 minutes to drive to Dubai Mall, 15 minutes to Palm Jumeirah, 17 minutes to Burj Al Arab and 19 minutes to The Walk JBR.
- Dubai International Airport (DXB) is roughly 26 minutes' drive and the new Al Maktoum International Airport is roughly 32 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
Untitled Plot JVC11YMRA007 Milestones
Date Launched
2016
Construction Started
2016
Proximity to landmarks
Al Maktoum International Airport
32 mins drive
Burj Al Arab
17 mins drive
The Walk JBR
19 mins drive
Mall of the Emirates
16 mins drive
Ibn Battuta Mall
20 mins drive
Palm Jumeirah
15 mins drive
La Mer by Meraas
27 mins drive
Dubai International Airport
26 mins drive
Dubai Mall
20 mins drive
Construction Updates
If you would like to use any of our images please read about our free Propsearch Media Library.
Untitled Plot JVC11YMRA007 Construction Progress
Main structure
2020
Jul
Roughly 25% complete
The dates above refer to when we monitored the site and not the exact date that construction reached a particular stage.
Please note that our progress updates are visual estimations only and should not be confused with official progress reports issued by the government regulator.
We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here: