Propsearch guide to Dubai real estate: Developments
The Silver Lining
Residential building, JVT District 7, Jumeirah Village Triangle, Dubai
Updated 3rd Nov 2020
The Silver Lining Key Information
Location type
Residential building
Area
Phase
Under development
Floors
7
Building type
Mid-rise building
Companies Associated with The Silver Lining
Developer
Cost Consultant
Architectural Consultant
Contractor
- The Silver Lining is a seven-storey residential building under development in JVT District 7, Jumeirah Village Triangle, Dubai.
- The project was launched in 2017.
- Construction began in 2017.
- The project is being developed by Silver Lining Properties Limited.
- The design contract was awarded to National Engineering Bureau.
- Green Bridge Contracting has been appointed as the main contractor.
- The project is located on plot JVT07JMRA002.
- From The Silver Lining it takes roughly 22 minutes to drive to Dubai Mall, 17 minutes to Palm Jumeirah, 19 minutes to Burj Al Arab and 18 minutes to The Walk JBR.
- Dubai International Airport (DXB) is roughly 29 minutes' drive and the new Al Maktoum International Airport is roughly 28 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
Properties
One-click links to properties currently on the market in The Silver Lining.
Properties to rent in The Silver Lining
The Silver Lining Milestones
Date Launched
2017
Construction Started
2017
Proximity to landmarks
Palm Jumeirah
17 mins drive
Al Maktoum International Airport
28 mins drive
La Mer
29 mins drive
Mall of the Emirates
18 mins drive
Dubai Mall
22 mins drive
Burj Al Arab
19 mins drive
Ibn Battuta Mall
16 mins drive
The Walk JBR
18 mins drive
Dubai International Airport
29 mins drive
Construction Updates
If you would like to use any of our images please read about our free Propsearch Media Library.
The Silver Lining Construction Progress
Main structure
2020
Jul
Topped out
Facade
2020
Jul
In the late stages
MEP & interior fit-out
2020
Jul
Underway
MEP = Mechanical, Electrical and Plumbing.
The dates above refer to when we monitored the site and not the exact date that construction reached a particular stage.
Please note that our progress updates are visual estimations only and should not be confused with official progress reports issued by the government regulator.
We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here: