Propsearch guide to Dubai real estate: Developments
Singapore Expo 2020 Pavilion
Expo 2020 pavilion, Expo 2020 Distrct, Dubai South, Dubai
Updated 22nd Oct 2020
Singapore Expo 2020 Pavilion Key Information
Location type
Expo 2020 pavilion
Area
Phase
Under development
If you would like to use any of our images please read about our free Propsearch Media Library.
Companies Associated with Singapore Expo 2020 Pavilion
Architectural Consultant
Engineering Consultant
Contractor
- The estimated handover date was 2020.
- The project is owned by Urban Redevelopment Authority.
- The design contract was awarded to Woha Architects.
- Evan Lim Penta Construction LLC has been appointed as the main contractor.
- From Singapore Expo 2020 Pavilion it takes roughly 35 minutes to drive to Dubai Mall, 28 minutes to Palm Jumeirah, 34 minutes to Burj Al Arab and 29 minutes to The Walk JBR.
- Dubai International Airport (DXB) is roughly 41 minutes' drive and the new Al Maktoum International Airport is roughly 26 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
Singapore Expo 2020 Pavilion Milestones
Estimated Handover Date
2020
Proximity to landmarks
Palm Jumeirah
28 mins drive
Al Maktoum International Airport
26 mins drive
La Mer
41 mins drive
Mall of the Emirates
31 mins drive
Dubai Mall
35 mins drive
Burj Al Arab
34 mins drive
Ibn Battuta Mall
23 mins drive
The Walk JBR
29 mins drive
Dubai International Airport
41 mins drive
Construction Updates
If you would like to use any of our images please read about our free Propsearch Media Library.
We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here: