Propsearch guide to Dubai real estate: Developments
Prudential Tower 1
Residential building, JVC District 18, Jumeirah Village Circle, Dubai
Updated 7th Jan 2021
Prudential Tower 1 Key Information
Location type
Residential building
Area
Phase
Under development
Floors
24
Floors below ground
1
Building type
High-rise building
If you would like to use any of our images please read about our free Propsearch Media Library.
Companies Associated with Prudential Tower 1
Developer
Developer
Architectural Consultant
Architectural Consultant
- Prudential Tower 1 is a 24-storey residential building under development in JVC District 18, Jumeirah Village Circle, Dubai.
- Construction began in 2009.
- The project is being developed by Al Tajir Real Estate.
- The design contract was awarded to Al Hilal Engineering Consultants.
- Other companies involved with Prudential Tower 1 include Mimosa Investments Limited and LACASA Architects & Engineering Consultants.
- The substructure contains one basement level which is dedicated to parking.
- The project is located on plot JVC18TPC001.
- From Prudential Tower 1 it takes roughly 19 minutes to drive to Dubai Mall, 13 minutes to Palm Jumeirah, 15 minutes to Burj Al Arab and 17 minutes to The Walk JBR.
- Dubai International Airport (DXB) is roughly 24 minutes' drive and the new Al Maktoum International Airport is roughly 32 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
-
One of two towers planned by this developer. Prudential Tower 2 is on a nearby plot.
Prudential Tower 1 Milestones
Construction Started
2009
Proximity to landmarks
Palm Jumeirah
13 mins drive
Al Maktoum International Airport
32 mins drive
La Mer
25 mins drive
Mall of the Emirates
14 mins drive
Dubai Mall
19 mins drive
Burj Al Arab
15 mins drive
Ibn Battuta Mall
18 mins drive
The Walk JBR
17 mins drive
Dubai International Airport
24 mins drive
Construction Updates
If you would like to use any of our images please read about our free Propsearch Media Library.
Prudential Tower 1 Construction Progress
Main structure
2020
Jul
Roughly 50% complete
The dates above refer to when we monitored the site and not the exact date that construction reached a particular stage.
Please note that our progress updates are visual estimations only and should not be confused with official progress reports issued by the government regulator.
We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here: