Macintyre Building
Residential building, Al Barsha 1, Al Barsha, Dubai
Updated 28th Jul 2020
Macintyre Building Key Information
Location type
Residential building
Area
Phase
Under development
Floors
16
Floors below ground
1
Building type
High-rise building
Companies Associated with Macintyre Building
Developer
Cost Consultant
Engineering Consultant
Contractor
MEP Consultant
MEP Consultant
- Macintyre Building is a 16-storey residential building under development in Al Barsha 1, Al Barsha, Dubai.
- The project is being developed by Macintyre Asset Management.
- Roberts Constructions has been appointed as the main contractor.
- Other companies involved with Macintyre Building include Brewer Smith Brewer Group, Raagan Technical Services, Proleed Engineering Consultants and SNC Lavalin.
- The substructure contains one basement level which is dedicated to parking.
- The project is located on plot 3731177.
- From Macintyre Building it takes roughly 14 minutes to drive to Dubai Mall, 14 minutes to Palm Jumeirah, 11 minutes to Burj Al Arab and 16 minutes to The Walk JBR.
- Dubai International Airport (DXB) is roughly 22 minutes' drive and the new Al Maktoum International Airport is roughly 36 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
Proximity to landmarks
Palm Jumeirah
14 mins drive
Al Maktoum International Airport
36 mins drive
La Mer
22 mins drive
Mall of the Emirates
6 mins drive
Dubai Mall
14 mins drive
Burj Al Arab
11 mins drive
Ibn Battuta Mall
15 mins drive
The Walk JBR
16 mins drive
Dubai International Airport
22 mins drive
Construction Updates
If you would like to use any of our images please read about our free Propsearch Media Library.
Macintyre Building Construction Progress
Main structure
2020
Jul
Topped out
Facade
2020
Jul
Complete
MEP & interior fit-out
2020
Jul
In early stages
MEP = Mechanical, Electrical and Plumbing.
The dates above refer to when we monitored the site and not the exact date that construction reached a particular stage.
Please note that our progress updates are visual estimations only and should not be confused with official progress reports issued by the government regulator.