Hercules Guide Contents
Advertise with us

If you are a Dubai-based estate agency or developer and would like to advertise with us plase contact us here:

Propsearch guide to Dubai real estate: Developments

Hercules

Residential building, Living Legends, DubaiLand, Dubai
Hercules Key Information
Location type
Residential building
Phase
Complete
Floors
12
Floors below ground
1
Building type
High-rise building
Total units
142
Unit types
33 studios
31 one-bedroom apartments
38 two-bedroom apartments
32 three-bedroom apartments
8 four-bedroom apartments
Companies Associated with Hercules
Developer
Architectural Consultant
  • Hercules is a 12-storey residential building in Living Legends, DubaiLand, Dubai.
  • The development contains a total of 142 units.
  • The building contains a mix of studios, one-, two-, three- and four-bedroom apartments.
  • The estimated handover date was March 2015.
  • Construction began in 2009 and was completed by 2016.
  • The project was developed by Tanmiyat Global.
  • The project was designed by Alajmi Engineering Consultants.
  • The main building work was done by Beijing Emirates International Construction Co..
  • The substructure contains one basement level which is dedicated to parking.
  • The project is located on plot RT10.
  • From Hercules it takes roughly 24 minutes to drive to Dubai Mall, 25 minutes to Palm Jumeirah, 25 minutes to Burj Al Arab and 29 minutes to The Walk JBR.
  • Dubai International Airport (DXB) is roughly 24 minutes' drive and the new Al Maktoum International Airport is roughly 37 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
Hercules Milestones
Estimated Handover Date
March 2015
Construction Started
2009
Date Completed
2016
Proximity to landmarks
The Walk JBR
29 mins drive
Dubai International Airport
24 mins drive
Ibn Battuta Mall
28 mins drive
La Mer
32 mins drive
Palm Jumeirah
25 mins drive
Mall of the Emirates
25 mins drive
Dubai Mall
24 mins drive
Al Maktoum International Airport
37 mins drive
Burj Al Arab
25 mins drive

Construction History

Hercules Construction Progress

Main structure
2014
Jun
In early stages
2015
Apr
Topped out

The dates above refer to when we monitored the site and not the exact date that construction reached a particular stage.

Please note that our progress updates are visual estimations only and should not be confused with official progress reports issued by the government regulator.

Design Stage

We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here:

keyboard_arrow_down
Dubai Project Search
Dubai Real Estate Guides
0 Favourite Properties
format_list_bulleted View share Share save Save delete Clear
Search Filters
Dubai Property Search
Share your favourite properties with a friend.
By sending you agree to our terms and conditions
This site is protected by reCAPTCHA
Privacy Terms
Backup your Favourites
Backup your favourite properties via email.
By sending you agree to our terms and conditions
This site is protected by reCAPTCHA
Privacy Terms
Search for properties by area or building
Map
N Burj Khalifa Global Village DXB Airport Burj Al Arab Mohammed Bin Rashid City The World Islands Dubai World Central Expo 2020 Jumeirah Village Triangle Sports City Barsha Heights Living Legends International City Dubai Marina & JBR Dubai Investments Park Falconcity Reem Jumeirah Village Circle Umm Suqeim The Villa Palm Jumeirah Silicon Oasis Motor City Mirdif Dubai Media City Jumeirah Park Jumeirah Islands Emirates Living Remraam Dubai Hills Estate Jumeirah Lakes Towers Downtown Dubai Dubai Production City Al Barsha Arabian Ranches Jumeirah Golf Estates Sustainable City Akoya Oxygen Arjan Meydan Financial Centre Discovery Gardens Business Bay Al Furjan Jumeirah Al Barari Mudon Damac Hills Town Square Sobha Hartland Bur Dubai District One Al Quoz Al Jaddaf Dubai South Deira City Walk
Search for properties close to school
Search for properties close to the metro
Rent Buy
arrow_drop_down