Dorchester Hotel Dubai Guide Contents
Advertise with us

If you are a Dubai-based estate agency or developer and would like to advertise with us plase contact us here:

Propsearch guide to Dubai real estate: Developments

Dorchester Hotel Dubai

Hotel, Business Bay, Dubai
Dorchester Hotel Dubai Key Information
Location type
Hotel
Phase
Under development
Floors
32
Floors below ground
2
Building type
Skyscraper
Companies Associated with Dorchester Hotel Dubai
Developer
Financier
Architectural Consultant
Architectural Consultant
Piling Contractor
  • Dorchester Hotel Dubai is a hotel under development in Business Bay, Dubai.
  • The project was launched in 2017.
  • The estimated handover date was 2020.
  • Construction began in 2017.
  • The project is being developed by Omniyat Properties.
  • The design contract was awarded to Brewer Smith Brewer Group.
  • Roberts Constructions has been appointed as the main contractor and the piling work is being carried out by NSCC International.
  • Other companies involved with Dorchester Hotel Dubai include Sky Palaces Real Estate, Foster + Partners and Ajman Bank.
  • The substructure contains two basement levels which are dedicated to parking.
  • The project is located on plot BB.B03.018 / 3466829.
  • From Dorchester Hotel Dubai it takes roughly 13 minutes to drive to Dubai Mall, 22 minutes to Palm Jumeirah, 20 minutes to Burj Al Arab and 25 minutes to The Walk JBR.
  • Dubai International Airport (DXB) is roughly 22 minutes' drive and the new Al Maktoum International Airport is roughly 42 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
  • The 32-storey development includes Dorchester Collection’s first hotel in the region and luxury residences to be known as Private Residences by Dorchester Collection.

  • It will also include high-end restaurants and shops as well as a surrounding mixed-use precinct.

  • In March 2018 the construction contract was awarded to a joint venture between Australian firm Roberts Constructions and Impresa Pizzarotti & C., one of Italy’s most established construction firms.

  • The project is due for completion in 2020.

Properties

One-click links to properties currently on the market in Dorchester Hotel Dubai.

Properties for sale in Dorchester Hotel Dubai

Invest in real estate in Dorchester Hotel Dubai

Dorchester Hotel Dubai Milestones
Date Launched
2017
Estimated Handover Date
2020
Construction Started
2017
Proximity to landmarks
Palm Jumeirah
22 mins drive
Al Maktoum International Airport
42 mins drive
La Mer
20 mins drive
Mall of the Emirates
17 mins drive
Dubai Mall
13 mins drive
Burj Al Arab
20 mins drive
Ibn Battuta Mall
26 mins drive
The Walk JBR
25 mins drive
Dubai International Airport
22 mins drive

Construction Updates

Dorchester Hotel Dubai Construction Progress

Pre-construction
2017
May
Groundwork/shoring underway
Aug
Piling complete
2018
Feb
Foundation underway
Jun
Foundation complete
Main structure
2018
Jun
Underway
2019
Mar
Roughly 25% complete
Dec
Roughly 50% complete
2020
Jul
Topped out
Facade
2019
Dec
In early stages
2020
Jul
Roughly 50% complete

The dates above refer to when we monitored the site and not the exact date that construction reached a particular stage.

Please note that our progress updates are visual estimations only and should not be confused with official progress reports issued by the government regulator.

We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here:

keyboard_arrow_down
Dubai Project Search
Dubai Real Estate Guides
0 Favourite Properties
format_list_bulleted View share Share save Save delete Clear
Search Filters
Dubai Property Search
Share your favourite properties with a friend.
By sending you agree to our terms and conditions
This site is protected by reCAPTCHA
Privacy Terms
Backup your Favourites
Backup your favourite properties via email.
By sending you agree to our terms and conditions
This site is protected by reCAPTCHA
Privacy Terms
Search for properties by area or building
Map
N Burj Khalifa Global Village DXB Airport Burj Al Arab Mohammed Bin Rashid City The World Islands Dubai World Central Expo 2020 Jumeirah Village Triangle Sports City Barsha Heights Living Legends International City Dubai Marina & JBR Dubai Investments Park Falconcity Reem Jumeirah Village Circle Umm Suqeim The Villa Palm Jumeirah Silicon Oasis Motor City Mirdif Dubai Media City Jumeirah Park Jumeirah Islands Emirates Living Remraam Dubai Hills Estate Jumeirah Lakes Towers Downtown Dubai Dubai Production City Al Barsha Arabian Ranches Jumeirah Golf Estates Sustainable City Akoya Oxygen Arjan Meydan Financial Centre Discovery Gardens Business Bay Al Furjan Jumeirah Al Barari Mudon Damac Hills Town Square Sobha Hartland Bur Dubai District One Al Quoz Al Jaddaf Dubai South Deira City Walk
Search for properties close to school
Search for properties close to the metro
Rent Buy
arrow_drop_down