Propsearch guide to Dubai real estate: Developments
Berton by Azizi
Residential building, Al Furjan, Jebel Ali District, Dubai
Updated 28th Jul 2020
Berton by Azizi Key Information
Location type
Residential building
Area
Phase
Under development
Floors
8
Floors below ground
2
Building type
Mid-rise building
Total units
245
If you would like to use any of our images please read about our free Propsearch Media Library.
Companies Associated with Berton by Azizi
Developer
Architectural Consultant
Contractor
Piling Contractor
- Berton by Azizi is a eight-storey residential building under development in Al Furjan, Jebel Ali District, Dubai.
- The development will contain an estimated 245 units.
- The project was launched in June 2017.
- The estimated handover date was Q2 2019.
- Construction began in 2017.
- The project is being developed by Azizi Developments.
- The design contract was awarded to 360 Degrees Architectural Design Consultancy.
- Prestige Construction LLC has been appointed as the main contractor and the piling work is being carried out by Al Zahraa Foundation Contractors LLC.
- The substructure contains two basement levels which are dedicated to parking.
- The project is located on plot AFC016.
- From Berton by Azizi it takes roughly 26 minutes to drive to Dubai Mall, 18 minutes to Palm Jumeirah, 24 minutes to Burj Al Arab and 19 minutes to The Walk JBR.
- Dubai International Airport (DXB) is roughly 34 minutes' drive and the new Al Maktoum International Airport is roughly 32 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
Berton by Azizi Milestones
Date Launched
June 2017
Estimated Handover Date
Q2 2019
Construction Started
2017
Proximity to landmarks
Palm Jumeirah
18 mins drive
Al Maktoum International Airport
32 mins drive
La Mer
34 mins drive
Mall of the Emirates
21 mins drive
Dubai Mall
26 mins drive
Burj Al Arab
24 mins drive
Ibn Battuta Mall
12 mins drive
The Walk JBR
19 mins drive
Dubai International Airport
34 mins drive
Construction Updates
If you would like to use any of our images please read about our free Propsearch Media Library.
Berton by Azizi Construction Progress
Main structure
2020
Mar
In early stages
The dates above refer to when we monitored the site and not the exact date that construction reached a particular stage.
Please note that our progress updates are visual estimations only and should not be confused with official progress reports issued by the government regulator.
Berton by Azizi in the News

Azizi Developments awards $13.6m contract to Prestige Constructions
Arabian Business, 26th Dec 2019
Arabian Business, 26th Dec 2019
Nearby Attractions
We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here: