Azizi Riviera won ‘Residential Project of The Year’ at the Innovation in Construction & FM Awards 2020.
In March 2022 the CEO of Azizi, Farhad Azizi, announced that the crystal lagoon will be completed in either Q1 or Q2 of 2023, stating that "Our completion date predictions comprise buffers, as we prefer to under promise and over deliver rather than vice versa."
The residential blocks will contain a total of 16,000 studios and one- and two-bedroom apartments.
The concept of Azizi Riviera is borrowed from the French Riviera. The buildings and spaces around them have been designed to emulate Mediterranean contemporary living. The open spaces and public areas offer ‘several conveniences’, while the clean lines and modern glass and wood facades combine to remind you that this is not really France.
The apartments will range from studios to one- and two-bedroom layouts, and there will also be a retail district and two hotels.
Azizi Riviera is accessible via Business Bay, Sheikh Zayed Road, Al Khail Road and Meydan Road, and in reach of various malls, cinemas, retail, schools and hospitals. The Meydan Hotel and Racecourse is just five minutes away, as will be the proposed One Mall and marina.
Meydan One is a major development of 71 buildings to be constructed in four phases. Its 13 regions will include a huge integrated retail district, luxury four- and five-star hotels and green open spaces.
The district promises ‘long walks on paved paths just a short distance from water transport, yachting facilities and a proposed marina’.
In July 2021 the developer announced that the canal, as depicted in the original masterplan, has been scrapped in favour of a 2.7km crystal lagoon with 51.5m gallons of desalinated clean water that residents can swim in.
The canal was originally depicted as being connected the the Dubai Creek via the Business Bay canal and there would have been a marina. Instead, the lagoon will have beach-like shores and will be encompassed by a walkway with a variety of boutiques and eateries.
In November 2020 Azizi Developments announced that they were investing over AED 100 million into the landscaping and further enhancements of Riviera’s phases 1 and 2, to develop ‘lifestyle-enhancing communal spaces’. The landscaping additions include swimming pools, yoga studios, barbeque facilities and shaded children’s playgrounds.
The map below shows the location of Azizi Riviera and just below are summaries of the nearest attractions, parks, beaches, golf clubs and cinemas.
Azizi Riviera has many schools nearby including Hartland International School at 0.8 km and North London Collegiate School Dubai at 1.0 km.
We've partnered with LadiesNightDubai.com and BrunchCrunch.ae to give an overview of the current Ladies Nights and Brunch offers in the vicinity of Azizi Riviera.
Explore communities that are either adjacent or close to Azizi Riviera.
A look at the original masterplan published by the developer at the time of the launch of Azizi Riviera.
See the development of Azizi Riviera in photos.
In March 2018 Azizi Developments announced that foundation works on phases 1 and 2 of Riviera were 85 percent complete and that basement works had commenced.
October 2020
April 2021
According to the developer, Phase 1 of Riviera is 68% complete. The first buildings are anticipated to be handed over by the end of 2021.
Phase 2 of the project is at 50% completion.
May 2021
According to the developer the first Riviera buildings are 78% complete.
As of January 2020 construction is 54% complete.
Construction has just begun on Riviera Phase 4.
Infrastructure works, including roads, sidewalks and lamp posts are nearing completion. Over 41,000 cubic metres of asphalt has been poured for more than 8km of roads. Over 600,000 bricks have been laid to build the sidewalks and 19 lamp posts and 24 traffic lights have been constructed.
Phase 1 is 85% complete, while Phase 2 and 3 have reached 80% and 50% construction completion respectively.
Power generators will be supplied by US-based Cummins Inc, wiring accessories will be supplied by Swiss ABB Ltd, the Landscaping works will be supplied Transgulf Cement Products and the water supply will be planned by Bell & Gossett.
Phase 1 and 2 of Riviera are now 99% and 83% sold out respectively.
There are 51 building developments in Azizi Riviera. For a full list of all Azizi Riviera buildings visit our Buildings Guide.
Propsearch.ae is a Dubai property portal that hosts ads from a number of local real estate agencies. In addition we offer a comprehensive set of community and building guides to help property buyers, renters and investors learn about the areas and buildings that they may wish to live or invest in.
Any enquiries sent regarding a specific property go directly to the estate agent that advertised the property and Propsearch does not play any role in any transactions that may result. Enquires that are sent directly to Propsearch are forwarded to a trusted partner agency that is best suited to handle the enquiry.
Please note that whilst we have a large database of buildings and developments, Propsearch is not a property developer, nor an agent, nor an architect, nor a construction contractor.