Propsearch guide to Dubai real estate: Developments
Ali Alshirawi Building Al Jaddaf
Residential building, Al Jaddaf, Dubai
Updated 11th Jul 2019
Ali Alshirawi Building Al Jaddaf Key Information
Location type
Residential building
Area
Floors
12
Building type
High-rise building
If you would like to use any of our images please read about our free Propsearch Media Library.
Companies Associated with Ali Alshirawi Building Al Jaddaf
Developer
Architectural Consultant
Contractor
Contractor
- Ali Alshirawi Building Al Jaddaf is a 12-storey residential building under construction in Al Jaddaf, Dubai.
- Construction began in 2017.
- The project is being developed by Ali Abdulla Mohammad Alshirawi.
- The design contract was awarded to Eng. Adnan Saffarini.
- Gulf Jewel Contracting LLC has been appointed as the main contractor.
- The project is located on plot 3261098.
- From Ali Alshirawi Building Al Jaddaf it takes roughly 13 minutes to drive to Dubai Mall, 24 minutes to Palm Jumeirah, 23 minutes to Burj Al Arab and 28 minutes to The Walk JBR.
- Dubai International Airport (DXB) is roughly 11 minutes' drive and the new Al Maktoum International Airport is roughly 46 minutes' drive. All durations are calculated by Google Maps and assume the fastest route in typical traffic conditions.
Ali Alshirawi Building Al Jaddaf Milestones
Construction Started
2017
Proximity to landmarks
Mall of the Emirates
20 mins drive
Al Maktoum International Airport
46 mins drive
Burj Al Arab
23 mins drive
Dubai International Airport
11 mins drive
Ibn Battuta Mall
28 mins drive
Palm Jumeirah
24 mins drive
La Mer
19 mins drive
Dubai Mall
13 mins drive
The Walk JBR
28 mins drive
Construction Updates
If you would like to use any of our images please read about our free Propsearch Media Library.
We do our best to keep the data accurate. If you notice any mistakes on the page or have additional information you can notify us here: